You need to sign in or sign up before continuing.
The project intends to provide safe water by constructing 30 improved traditional wells to 4 villages in Songea district where over 3000 people will benefit from the project. The only source of water they use now is local dug wells which are open and
-
Iskaka Msigwa of Tanzania Mission to the Poor and Disabled (PADI)
- confidential
Implementation Status: completed Tue 06 Jan 2009, Over 16 Years agoPhotos from water project
The attached pictures are some of the vents during project implementation
- Impact Assessment (M&E) Phase Project completed on 15 Dec, 2008 Implementation Phase
- Implementation Phase Project started on 15 Dec, 2008 Preparation Phase
How it Works
Every field note helps building a history of activity at the project site. Every visit should result in a field note, including visits by peers and 3rd parties. Visits can be before implementation, during implementation and during operational state.
If the field note is during the operating phase of the project, then PWX considers the note as a verification note. Verification can show if the current operating state is different from that in the 'final' report and thus draw attention and resources to resolve issues.
Soon PWX AnalytiX will track the number of projects verified and combine that with the amount of time elapsed since 'completion', to summarize monitoring efforts and the sustainability of projects.
The project intends to provide safe water by constructing 30 improved traditional wells to 4 villages in Songea district where over 3000 people will benefit from the project. The only source of water they use now is local dug wells which are open and