Self-supporting community- based mitigation program that provides arsenic safe water using modified dugwells along with public education on water related health effects.
MetriX Summary
-
PW247: Number of families (1)
-
PW247: Number of users (1)
show allDocuments
Narrative
This site #PW247, is in Shadarmath Village of Deuli Panchayat of Chakdah block of Nadia district. The land is donated by Ganesh Sarkar. Village meeting, followed by boring and digging is complete. The work of fitting the marble plates are pending.
-
Ranajit Bala of Project Well
- confidential
- SMS
Implementation Status: completed Fri 31 Jan 2014, Over 11 Years agogood water .12famelis 60people used for drinking and cooking.
-
Shikha Majumdar of Project Well
- confidential
- SMS
Implementation Status: completed Tue 10 Dec 2013, Over 11 Years agogive the hand over letterpacket.goo water 10 families 45 people drinking.
-
Shikha Majumdar of Project Well
- confidential
- SMS
Implementation Status: completed Thu 05 Dec 2013, Over 11 Years agogive the hand over lettar packed.
-
Ranajit Bala of Project Well
- confidential
- SMS
Implementation Status: completed Tue 19 Nov 2013, Over 11 Years agogood water. 16 families 72people used for drinking and cooking.
-
Ranajit Bala of Project Well
- confidential
- SMS
Implementation Status: completed Fri 23 Aug 2013, Almost 12 Years agogood water used for 15families68people.
-
Shikha Majumdar of Project Well
- confidential
- SMS
Implementation Status: completed Fri 05 Jul 2013, Almost 12 Years agodemography complete.and Water collected
-
Ranajit Bala of Project Well
- confidential
- SMS
Implementation Status: completed Mon 24 Jun 2013, Almost 12 Years agogiven theoline and did survey
-
Meera Hira-Smith of Project Well
- confidential
- SMS
Implementation Status: complete_unsuccessful Mon 25 Mar 2013, About 12 Years agowater tastes excellent used by 16 families.
-
Ranajit Bala of Project Well
- confidential
- SMS
Implementation Status: complete_unsuccessful Tue 26 Feb 2013, Over 12 Years agodone survey and given theoline
-
Ranajit Bala of Project Well
- confidential
- SMS
Implementation Status: completed Sat 29 Dec 2012, Over 12 Years agoGave the arsenic report and done survey
- Impact Assessment (M&E) Phase Project completed on 31 Oct, 2012 Implementation Phase
-
Meera Hira-Smith of Project Well
- confidential
Implementation Status: complete_unsuccessful Sat 13 Oct 2012, Over 12 Years agoConstruction is complete
People are using the water. And please see the final report document uploaded as pdf here> http://peerwater.org/en/projects/740.
This well is not used because sand is coming out with water. after the water level goes down maintenance will be done along with few other wells that have the same problem. - Implementation Phase Project started on 2 Apr, 2012 Preparation Phase
How it Works
Every field note helps building a history of activity at the project site. Every visit should result in a field note, including visits by peers and 3rd parties. Visits can be before implementation, during implementation and during operational state.
If the field note is during the operating phase of the project, then PWX considers the note as a verification note. Verification can show if the current operating state is different from that in the 'final' report and thus draw attention and resources to resolve issues.
Soon PWX AnalytiX will track the number of projects verified and combine that with the amount of time elapsed since 'completion', to summarize monitoring efforts and the sustainability of projects.
Self-supporting community- based mitigation program that provides arsenic safe water using modified dugwells along with public education on water related health effects.
Narrative
This site #PW247, is in Shadarmath Village of Deuli Panchayat of Chakdah block of Nadia district. The land is donated by Ganesh Sarkar. Village meeting, followed by boring and digging is complete. The work of fitting the marble plates are pending.
MetriX Summary
-
PW247: Number of families (1)
-
PW247: Number of users (1)
show allDocuments
Other Issues
Unusual and unexpected issues faced during project execution
people are not using because there is sand in water. Need to do maintenance.
Learnings
Knowledge of project and process for sharing
It is always preferable to complete construction including housing before the monsoon arrives that is in mid-June. Because during and after monsoon work becomes hindered due to the high level of the water table. But in this case sand is coming out that could be only observed during the first monsoon after construction and maintenance work can only be followed after the water table goes down sometimes in December and can be as late as in February in some places.
Impact
Maintenance/Operating Costs Annual, in US$: $40
Creating and measuring long-term impact
Implementer: Project Well & Aqua Welfare Society
Aqua Welfare Society (AWS) is the partner NGO of Project Well.
Funding
- funded:
- $1,246