Narrative
New site in North 24 Parganas in the Baduria Block. This bore-dugwell #PW237 is in the S.Hyderpur village of Bagjola Panchayet and the land is donated by Rashid Ali.
-
Farida Bibi of Project Well
- confidential
- SMS
Implementation Status: completed Tue 16 Jul 2013, Almost 12 Years agowe are doing health metting
-
Animesh sarkar of Project Well
- confidential
- SMS
Implementation Status: completed Tue 27 Nov 2012, Over 12 Years ago -
Meera Hira-Smith of Project Well
- confidential
Implementation Status: completed Mon 26 Nov 2012, Over 12 Years agoPW237:Visited by Meera Smith and Laltu Midhya to collect water sample to test for arsenic and for inspection.
This well is working well. People are satisfied with the quality of water that is better than their private tubewell for it does not have iron nor any arsenic. Some users have stomach complaints of gas/wind that they say is much improved after the use of the new treated bore-dugwell water.
-
Farida Bibi of Project Well
- confidential
- SMS
Implementation Status: completed Thu 01 Nov 2012, Over 12 Years agothere is 500ml theoline 17 ft water 8 families 43 people good water used for drinking and cooking
- Impact Assessment (M&E) Phase Project completed on 31 Oct, 2012 Implementation Phase
-
Meera Hira-Smith of Project Well
- confidential
Implementation Status: in_progress Mon 21 May 2012, About 13 Years agopilot test
Pilot test was done to check the depth of sand layer. The sand layer was located at the depth of 7 feet. Village meeting is being held on 22nd May.
- Implementation Phase Project started on 1 Nov, 2011 Preparation Phase
How it Works
Every field note helps building a history of activity at the project site. Every visit should result in a field note, including visits by peers and 3rd parties. Visits can be before implementation, during implementation and during operational state.
If the field note is during the operating phase of the project, then PWX considers the note as a verification note. Verification can show if the current operating state is different from that in the 'final' report and thus draw attention and resources to resolve issues.
Soon PWX AnalytiX will track the number of projects verified and combine that with the amount of time elapsed since 'completion', to summarize monitoring efforts and the sustainability of projects.
Self-supporting community- based mitigation program that provides arsenic safe water using modified dugwells along with public education on water related health effects.
Narrative
New site in North 24 Parganas in the Baduria Block. This bore-dugwell #PW237 is in the S.Hyderpur village of Bagjola Panchayet and the land is donated by Rashid Ali.
MetriX Summary
-
PW237: Number of Families (4)
-
PW237: Number of Users (4)
-
PW237: Column of Water (ft) (3)
-
PW237: Theoline (Chlorine) supplied in ml (3)
show allDocuments
Impact
People Getting Safe Drinking Water: 43
Registers will be created as soon as the community starts using the water from this bore-dugwell.
Maintenance/Operating Costs Annual, in US$: $40
Creating and measuring long-term impact
Implementer: Project Well & Aqua Welfare Society
Aqua Welfare Society (AWS) is the partner NGO of Project Well.
Funding
- funded:
- $1,073