Drill a shallow borehole and install a handpump
Narrative
Another success drill, more details coming soon.
-
- Visitor
- confidential
Operating Status: working_excellently Sun 08 Dec 2024, 6 Months ago -
- Visitor
- confidential
Operating Status: working_excellently Mon 20 May 2024, About 1 Year ago -
Cabrini Vianney of International Lifeline Fund
- confidential
Implementation Status: completed Mon 29 Nov 2010, Over 14 Years agoExternal Evaluation of ILF's First 90 Boreholes
Well functional but in need of minor repairs such as the replacement of pipes, rods, chains, and the center bolt.
- Impact Assessment (M&E) Phase Project completed on 30 Mar, 2007 Implementation Phase
- Implementation Phase Project started on 29 Mar, 2007 Preparation Phase
How it Works
Every field note helps building a history of activity at the project site. Every visit should result in a field note, including visits by peers and 3rd parties. Visits can be before implementation, during implementation and during operational state.
If the field note is during the operating phase of the project, then PWX considers the note as a verification note. Verification can show if the current operating state is different from that in the 'final' report and thus draw attention and resources to resolve issues.
Soon PWX AnalytiX will track the number of projects verified and combine that with the amount of time elapsed since 'completion', to summarize monitoring efforts and the sustainability of projects.
Drill a shallow borehole and install a handpump
Narrative
Another success drill, more details coming soon.
Impact
People Impacted: 874
People Getting Safe Drinking Water: 874
Maintenance/Operating Costs Annual, in US$: $107
Creating and measuring long-term impact
Funding
- funded:
- $2,146
- Community:
- $32
- Final Cost:
- $2,178
- edit $2,146:
- International Lifeline Fund