Yeoti is situated in the interior and barren area at the distance of 30 km. from block and 50 km from district HQ. The livelihoods of the communities is dependent on rain fed agriculture, which is insufficient to support their families

Narrative

Before the watershed development the village faced acute drinking water problem. Therefore, the drinking water project was implemented under the ‘Bharat Nirman’ government scheme in the village in 2009. Under this scheme the main pipeline of 1000 meters and distribution of pipeline of 6000 meters is completed. Excavation of water source well and water storage tank of 40,000 litres capacity has been completed. In the initial stage, the drinking water was provided through the four common stand posts. Due to the common stand posts, the wastewater flowed in the interior part of the village and led to more wastage of water. Therefore, the Water Committee with the support of the Grampanchayat has successfully completed the cost effective and community managed drinking water project in their village. Under this, the drinking water is being provided to 100 households (to those who live at the long distance from the distribution pipeline) through individual water connections at their doorstep. A separate water connection has been provided to primary school and kinder garden. Each family has constructed soak pits or developed kitchen garden for the safe disposal of domestic waste water.