Pimpri hamlet is a part of the Tale village Gram Panchayat. Agriculture is rainfed. It is determined by low productivity, resulting in degraded natural resources. We have implemented a water system to aid them in their water crisis.
- Impact Assessment (M&E) Phase Project completed on 31 Jan, 2008 Implementation Phase
- Implementation Phase Project started on 1 Apr, 2007 Preparation Phase
How it Works
Every field note helps building a history of activity at the project site. Every visit should result in a field note, including visits by peers and 3rd parties. Visits can be before implementation, during implementation and during operational state.
If the field note is during the operating phase of the project, then PWX considers the note as a verification note. Verification can show if the current operating state is different from that in the 'final' report and thus draw attention and resources to resolve issues.
Soon PWX AnalytiX will track the number of projects verified and combine that with the amount of time elapsed since 'completion', to summarize monitoring efforts and the sustainability of projects.
Pimpri hamlet is a part of the Tale village Gram Panchayat. Agriculture is rainfed. It is determined by low productivity, resulting in degraded natural resources. We have implemented a water system to aid them in their water crisis.
Sustainability
Creating and measuring long-term impact
The maintenance cost as per revenue model works out to $752 per year. The yearly contribution is being collected by the Water Comittee. This would be used for the maintenance and for reserve funds for the replacement of spare parts and major repairs etc. in the long run after 5-7 years.
Learnings
Knowledge of project and process for sharing
The drinking water activity has helped the village community to come together for a common cause and helped to strengthen their unity and integrity.
- the illiterate rural women are capable to implement honestly and parsimoniously large projects with big budgets by maintaining transparency if their capacities are built through training interventions and given opportunity to implement the projects.
Impact
People Getting Safe Drinking Water: 534
People Getting Sanitation: 214
The whole village now has access to safe drinking water. This is used for domestic purpose and for the livestock for drinking water.
- 8 families have constructed individual toilets and the others families are in the process of constructing the same.
Maintenance/Operating Costs Annual, in US$: $752
Creating and measuring long-term impact
The maintenance cost as per revenue model works out to $752 per year. The yearly contribution is being collected by the Water Comittee. This would be used for the maintenance and for reserve funds for the replacement of spare parts and major repairs etc. in the long run after 5-7 years.
Funding
- funded:
- $4,395
- Final Cost:
- $4,395
- edit $4,395:
- Blue Planet Network