Model ECOSAN toilets were constructed for 9 nos. of Households in this village. The women from these households are members of women SHGs guided and monitored by Ekoventure. The women were arranged with loans from the SHGs towards their contribution.
-
Tamaraiselvi V of Ekoventure
- confidential
- SMS
Implementation Status: in_progress Thu 06 Sep 2012, Almost 13 Years agoindru kalanivasal valliyamai,amutha,piramila vittu toilet open seiythom.
-
Tamaraiselvi V of Ekoventure
- confidential
- SMS
Implementation Status: in_progress Wed 05 Sep 2012, Almost 13 Years agoindru kalanivasal mariyammal vittu toilet open seiythom.
-
Tamaraiselvi V of Ekoventure
- confidential
- SMS
Implementation Status: in_progress Thu 30 Aug 2012, Almost 13 Years agoKazhanivasal 7 members vittukku sendru toilet parthu vanthean.
-
S. Pushpalatha of Ekoventure
- confidential
Implementation Status: completed Mon 03 Jan 2011, Over 14 Years agoECOSAN toilets effectively utilised
All the 9 nos. of ECOSAN toliets were visited to monitor. All the families have got convinced in using this type - dry pit toilet. The toilets are kept clean and no bad odour was noticed in any of the toilets.
- Impact Assessment (M&E) Phase Project completed on 30 Jun, 2010 Implementation Phase
- Implementation Phase Project started on 1 Sep, 2009 Preparation Phase
How it Works
Every field note helps building a history of activity at the project site. Every visit should result in a field note, including visits by peers and 3rd parties. Visits can be before implementation, during implementation and during operational state.
If the field note is during the operating phase of the project, then PWX considers the note as a verification note. Verification can show if the current operating state is different from that in the 'final' report and thus draw attention and resources to resolve issues.
Soon PWX AnalytiX will track the number of projects verified and combine that with the amount of time elapsed since 'completion', to summarize monitoring efforts and the sustainability of projects.
Model ECOSAN toilets were constructed for 9 nos. of Households in this village. The women from these households are members of women SHGs guided and monitored by Ekoventure. The women were arranged with loans from the SHGs towards their contribution.
Impact
People Impacted: 45
People Getting Sanitation: 45
9 families - approximately 45 members got sanitation facilities
People Getting Other Benefits: 3
The Masons were trained in the construction of ECOSAN toilets.