installation of rope pumps in Manmbody village and parengepattai school.
- Impact Assessment (M&E) Phase Project completed on 15 Feb, 2010 Implementation Phase
- Implementation Phase Project started on 15 Aug, 2009 Preparation Phase
How it Works
Every field note helps building a history of activity at the project site. Every visit should result in a field note, including visits by peers and 3rd parties. Visits can be before implementation, during implementation and during operational state.
If the field note is during the operating phase of the project, then PWX considers the note as a verification note. Verification can show if the current operating state is different from that in the 'final' report and thus draw attention and resources to resolve issues.
Soon PWX AnalytiX will track the number of projects verified and combine that with the amount of time elapsed since 'completion', to summarize monitoring efforts and the sustainability of projects.
installation of rope pumps in Manmbody village and parengepattai school.
Impact
People Impacted: 330
People Getting Safe Drinking Water: 325
25 women, 225 children
School Children Getting Water: 200
People Getting Other Benefits: 10
5 community members and 5 school teachers got training
Maintenance/Operating Costs Annual, in US$: $4
Creating and measuring long-term impact
Funding
- funded:
- $400