Helping 189 households from ,Thuong Tin in Vietnam access drinking water. The system is managed by the Provincial Water Company.
Narrative
Historical Data Imported.
Helping 189 households from ,Thuong Tin in Vietnam access drinking water. The system is managed by the Provincial Water Company. The following methods were utilized for treatment: . The following chemicals are added:
Sustainability
Creating and measuring long-term impact
Electro-mechanical (pumps, etc.), Groundwater availability, , ,
Other Issues
Unusual and unexpected issues faced during project execution
Main Problems: Groundwater quality,Electro-mechanical (pumps, etc.),Treatment,Storage tank/construction,Distribution network, Main Reason for Problem: ,EMW planning, design & implementation,Poor (technical) maintenance,Funding/financial problems,Other
Impact
People Impacted: 495
People Getting Safe Drinking Water: 495
189.0
Member Specific Project Data
Water Source: G
Project Type: N
Treatment Type:
Chemicals Added:
Length of Pipe System (m): 2548
Comments on Status:
Comments on Solutions:
Notes: still operates. However the filtration system is old,Local water managers suggest EMW to upgrade the filtration system for better water quality
Cost in Local Currency: 537500000