Helping 218 households from Dien Phong,Dien Ban in Vietnam access drinking water. The system is managed by the local Hamlet.
Narrative
Historical Data Imported.
Helping 218 households from Dien Phong,Dien Ban in Vietnam access drinking water. The system is managed by the local Hamlet. The following methods were utilized for treatment: pressure.
- Impact Assessment (M&E) Phase Project completed on 31 Dec, 2006 Implementation Phase
- Implementation Phase Project started on 1 Jan, 2006 Preparation Phase
How it Works
Every field note helps building a history of activity at the project site. Every visit should result in a field note, including visits by peers and 3rd parties. Visits can be before implementation, during implementation and during operational state.
If the field note is during the operating phase of the project, then PWX considers the note as a verification note. Verification can show if the current operating state is different from that in the 'final' report and thus draw attention and resources to resolve issues.
Soon PWX AnalytiX will track the number of projects verified and combine that with the amount of time elapsed since 'completion', to summarize monitoring efforts and the sustainability of projects.
Helping 218 households from Dien Phong,Dien Ban in Vietnam access drinking water. The system is managed by the local Hamlet.
Narrative
Historical Data Imported.
Helping 218 households from Dien Phong,Dien Ban in Vietnam access drinking water. The system is managed by the local Hamlet. The following methods were utilized for treatment: pressure.
Sustainability
Creating and measuring long-term impact
Electro-mechanical (pumps, etc.), Groundwater availability, , ,
Other Issues
Unusual and unexpected issues faced during project execution
Main Problems: , ,Surface water quality,Electro-mechanical (pumps, etc.),Treatment Main Reason for Problem: , , ,EMW planning, design & implementation,Water quantity/quality declined over time
Impact
People Impacted: 1008
People Getting Safe Drinking Water: 1008
Member Specific Project Data
Water Source: G
Project Type: N
Treatment Type: pressure
Chemicals Added:
Length of Pipe System (m): 6880
Comments on Status: stop working - bad operators, pumps broke
Comments on Solutions: The new water manager kindly requests EMW to help replace the filtration materials, get 1 river pump. If so, he is willing to invest 40% of the cost.
Notes: OK,There is great need for clean water in the commune, so upgrading the system is in need.
Cost in Local Currency: 413316000
Funding
- funded:
- $19,224
- Final Cost:
- $19,224
- edit $19,224:
- Janet McKinley and George Miller