Self-supporting community- based mitigation program that provides arsenic safe water using modified bore-dugwell along with public education on water related health effects.
Narrative
This new site #PW272 is in the village of Chougacha of Chakdah block in Nadia. The name of the donor is Shankar Biswas. Sand layer was found at the depth of 16 feet on May 10th 2013 and the arsenic level of the tubewell of Ashim biswas, the neighbor, was found to be 0.1 mg/L at the laboratory at Baerachapa.
__________________________________
The previous site was cancelled due to nonavailability of sand within 30 feet.
------------------------------------
This site #PW272 is in the Goyalbari village under the jurisdiction of the Deuli panchayat of Chakda block in the district of North 24 Parganas.. The arsenic concentration of the private tubewell of Horekrisno Saddar was found to be 0.04 mg/L that was tested on 12 December 2012 with the VisuPAsS Visual Portable Arsenic testing field kit. The construction is supposed to start in mid February 2013.
-
Shikha Majumdar of Project Well
- confidential
- SMS
Implementation Status: completed Mon 09 Dec 2013, Over 11 Years agogood water.there is 12 ft water. 1L theoline was given . 20families use for cooking.5 families 25 people use for cooking and drinking and 15 familes 70 people for drinking. and gave the arsenic report.
- Impact Assessment (M&E) Phase Project completed on 30 Nov, 2013 Implementation Phase
-
Suparna Mondol of Project Well
- confidential
- SMS
Implementation Status: completed Fri 27 Sep 2013, Over 11 Years agoHealth meeting has been finished. M-6, F-14, Ch-6. Due to torrential rain there was power failure hence projector program had to be postponed.
-
Shikha Majumdar of Project Well
- confidential
- SMS
Implementation Status: completed Wed 25 Sep 2013, Over 11 Years agonear pw 172 duing site selection for 3 site and water callect.
-
Shikha Majumdar of Project Well
- confidential
- SMS
Implementation Status: completed Thu 05 Sep 2013, Almost 12 Years agogave the theoline 1 litre, 28 families 122 people drinking and cooking ,
-
Shikha Majumdar of Project Well
- confidential
- SMS
Implementation Status: completed Wed 24 Jul 2013, Almost 12 Years agoi have done demography .24 families used people 120.
-
Shikha Majumdar of Project Well
- confidential
- SMS
Implementation Status: completed Mon 15 Jul 2013, Almost 12 Years agogood water 23 families used fordrinking and cooking .500 ml theolie was given.
-
Ranajit Bala of Project Well
- confidential
- SMS
Implementation Status: in_progress Sat 08 Jun 2013, About 12 Years agoThe dugwell have been completed.
- Implementation Phase Project started on 1 Dec, 2012 Preparation Phase
How it Works
Every field note helps building a history of activity at the project site. Every visit should result in a field note, including visits by peers and 3rd parties. Visits can be before implementation, during implementation and during operational state.
If the field note is during the operating phase of the project, then PWX considers the note as a verification note. Verification can show if the current operating state is different from that in the 'final' report and thus draw attention and resources to resolve issues.
Soon PWX AnalytiX will track the number of projects verified and combine that with the amount of time elapsed since 'completion', to summarize monitoring efforts and the sustainability of projects.
Self-supporting community- based mitigation program that provides arsenic safe water using modified bore-dugwell along with public education on water related health effects.
Narrative
This new site #PW272 is in the village of Chougacha of Chakdah block in Nadia. The name of the donor is Shankar Biswas. Sand layer was found at the depth of 16 feet on May 10th 2013 and the arsenic level of the tubewell of Ashim biswas, the neighbor, was found to be 0.1 mg/L at the laboratory at Baerachapa.
__________________________________
The previous site was cancelled due to nonavailability of sand within 30 feet.
------------------------------------
This site #PW272 is in the Goyalbari village under the jurisdiction of the Deuli panchayat of Chakda block in the district of North 24 Parganas.. The arsenic concentration of the private tubewell of Horekrisno Saddar was found to be 0.04 mg/L that was tested on 12 December 2012 with the VisuPAsS Visual Portable Arsenic testing field kit. The construction is supposed to start in mid February 2013.
Impact
People Getting Safe Drinking Water: 40
Registers will be created as soon as the community starts using the water from this bore-dugwell.
People Getting Other Benefits: 30
Awareness programs such as village meetings before and after the construction of the well, health meeting and if needed projector program is done during the first year of construction. During this time the villagers are informed and educated on water borne diseases, health effects of arsenic in the drinking water and also educate, both, young and old, mainly women on how practicing proper personal hygiene prevents contagious diseases. At times more than 30 people gather at such meetings.
Maintenance/Operating Costs Annual, in US$: $40
Creating and measuring long-term impact
Implementer: Project Well & Aqua Welfare Society
Aqua Welfare Society (AWS) is the partner NGO of Project Well.
Funding
- funded:
- $1,246