Self-supporting community- based mitigation program that provides arsenic safe water using modified bore-dugwell along with public education on water related health effects.
MetriX Summary
-
PW267: Number of families (2)
-
PW267: Number of users (2)
-
PW267: Column of Water (ft) (2)
-
PW267: Theoline (Chlorine) Supplied in ml (2)
Narrative
This site #PW267 is in the Matikumra village under the jurisdiction of the Chourashi panchayat of Deganga block in the district of North 24 Parganas.. The arsenic concentration of the private tubewell of Sirajul(member) was found to be 0.02 to 0.04 mg/L that was tested on 8 December 2012 with the VisuPAsS Visual Portable Arsenic testing field kit. The construction is supposed to start in mid February 2013.
- Impact Assessment (M&E) Phase Project completed on 30 Nov, 2013 Implementation Phase
-
Laltu Mirza of Project Well
- confidential
- SMS
Implementation Status: completed Wed 13 Nov 2013, Over 11 Years agoset washer and check valve today.
-
Suparna Mondol of Project Well
- confidential
- SMS
Implementation Status: completed Wed 03 Jul 2013, Almost 12 Years agoHealth meeting has been finished . M-5,F-9, Ch-5. Matikumra/ Deganga .
-
Meera Hira-Smith of Project Well
- confidential
Implementation Status: completed Mon 08 Apr 2013, About 12 Years agoConstruction is completed. visit to the site was on 7th april 2013 by the board members of AWS
Three board members of AWS and the director of Project Well have visited this site. They have expressed their satisfaction about the selection of the site and execution of work by the field team of AWS.
-
Meera Hira-Smith of Project Well
- confidential
- SMS
Implementation Status: in_progress Sun 07 Apr 2013, About 12 Years agoconst complete. At sirajul member land. Water quality is good. Filter to the delivery pipe will be fitted after 15 days aftr pumping out water for few days.The geologists r visiting with the treasurer of aws and meera smith. Temp today is 37 celsius. Farida khatun is in grade 7 says she walks for 1 hour to school.
-
Laltu Mirza of Project Well
- confidential
- SMS
Implementation Status: in_progress Wed 13 Mar 2013, Over 12 Years agodigging is done here today. 20 rings.depth of dugwell is 18.5 feet. bore is 12.5 feet inside the earth.
-
Anonymous
- Visitor
- confidential
- SMS
Implementation Status: completed Wed 13 Mar 2013, Over 12 Years agodiging is the done in mati kamra
-
Farida Bibi of Project Well
- confidential
- SMS
Implementation Status: in_progress Thu 07 Mar 2013, Over 12 Years agoCompleted boring at two sites of Matikumra
-
Meera Hira-Smith of Project Well
- confidential
Implementation Status: in_progress Sat 23 Feb 2013, Over 12 Years agopilot test
This is a new area hence pilot test to locate the sand layer was done. The sand layer was detected at 10 feet.
-
Meera Hira-Smith of Project Well
- confidential
Implementation Status: in_progress Sat 23 Feb 2013, Over 12 Years agopilot test
This is a new area hence pilot test to locate the sand layer was done. The sand layer was detected at 10 feet.
-
Meera Hira-Smith of Project Well
- confidential
Implementation Status: in_progress Sat 23 Feb 2013, Over 12 Years agopilot test
This is a new area hence pilot test to locate the sand layer was done. The sand layer was detected at 10 feet.
- Implementation Phase Project started on 1 Dec, 2012 Preparation Phase
How it Works
Every field note helps building a history of activity at the project site. Every visit should result in a field note, including visits by peers and 3rd parties. Visits can be before implementation, during implementation and during operational state.
If the field note is during the operating phase of the project, then PWX considers the note as a verification note. Verification can show if the current operating state is different from that in the 'final' report and thus draw attention and resources to resolve issues.
Soon PWX AnalytiX will track the number of projects verified and combine that with the amount of time elapsed since 'completion', to summarize monitoring efforts and the sustainability of projects.
Self-supporting community- based mitigation program that provides arsenic safe water using modified bore-dugwell along with public education on water related health effects.
Narrative
This site #PW267 is in the Matikumra village under the jurisdiction of the Chourashi panchayat of Deganga block in the district of North 24 Parganas.. The arsenic concentration of the private tubewell of Sirajul(member) was found to be 0.02 to 0.04 mg/L that was tested on 8 December 2012 with the VisuPAsS Visual Portable Arsenic testing field kit. The construction is supposed to start in mid February 2013.
MetriX Summary
-
PW267: Number of families (2)
-
PW267: Number of users (2)
-
PW267: Column of Water (ft) (2)
-
PW267: Theoline (Chlorine) Supplied in ml (2)
Impact
Maintenance/Operating Costs Annual, in US$: $40
Creating and measuring long-term impact
Implementer: Project Well & Aqua Welfare Society
Aqua Welfare Society (AWS) is the partner NGO of Project Well.
Funding
- funded:
- $1,246
Plan/Proposal
MetriX Summary
-
PW267: Number of families (2)
-
PW267: Number of users (2)
-
PW267: Column of Water (ft) (2)
-
PW267: Theoline (Chlorine) Supplied in ml (2)