Model ECOSAN toilets were constructed for 8 nos. of Households in this village. The women from these households are members of women SHGs guided and monitored by Ekoventure. The women were arranged with loans from the SHGs towards their contribution.
show allPhotos
show allDocuments
-
Exposure...
-
Exposure...
-
Amaravat...
-
Amuda_fa...
-
Amudaran...
-
Anandi.JPG
-
Anandi.jpg
-
Jayalaks...
-
Lakshmi_...
-
Malliga_...
-
Mariamma...
-
Premila_...
-
Selvaran...
-
Sumathy_...
-
Uyyavant...
-
Valliamm...
-
Audited_...
-
Mariyamm...
-
Valliyam...
-
Palaniam...
-
Anandi.JPG
-
Anandi.jpg
-
Amutha_R...
-
Pramila.JPG
-
Jayalaks...
-
Amutha.JPG
-
Tamaraiselvi V of Ekoventure
- confidential
- SMS
Implementation Status: completed Sat 08 Dec 2012, Over 12 Years agoindru kalanivasal p.palaniyammal,a.anadthi,c.lakxmi,r.sumathi,p.alamelu. ivargalutaiya toilet open seithom.
- Impact Assessment (M&E) Phase Project completed on 31 May, 2010 Implementation Phase
-
S. Pushpalatha of Ekoventure
- confidential
Implementation Status: in_progress Fri 05 Mar 2010, Over 15 Years agoExposure Visit to Trichy
42 nos. of women SHG members from various villages of Sethubavachatram block, Tanjore district were taken for an exposure visit to Trichy on 09.09.09 to witness the performance of the existing ECOSAN toilets both at Community level and at Household level. The ECOSAN toilets were constructed by SCOPE NGO. This exposure visit made the women to realise that dry pit toilets (ECOSAN) are more advantageous than that of the conventional flush toilets. This strenghtened their willingness to contribute a part of the amount for the construction of their own ECOSAN toilet.
- Implementation Phase Project started on 1 Sep, 2009 Preparation Phase
How it Works
Every field note helps building a history of activity at the project site. Every visit should result in a field note, including visits by peers and 3rd parties. Visits can be before implementation, during implementation and during operational state.
If the field note is during the operating phase of the project, then PWX considers the note as a verification note. Verification can show if the current operating state is different from that in the 'final' report and thus draw attention and resources to resolve issues.
Soon PWX AnalytiX will track the number of projects verified and combine that with the amount of time elapsed since 'completion', to summarize monitoring efforts and the sustainability of projects.
Model ECOSAN toilets were constructed for 8 nos. of Households in this village. The women from these households are members of women SHGs guided and monitored by Ekoventure. The women were arranged with loans from the SHGs towards their contribution.
show allPhotos
show allDocuments
-
Exposure...
-
Exposure...
-
Amaravat...
-
Amuda_fa...
-
Amudaran...
-
Anandi.JPG
-
Anandi.jpg
-
Jayalaks...
-
Lakshmi_...
-
Malliga_...
-
Mariamma...
-
Premila_...
-
Selvaran...
-
Sumathy_...
-
Uyyavant...
-
Valliamm...
-
Audited_...
-
Mariyamm...
-
Valliyam...
-
Palaniam...
-
Anandi.JPG
-
Anandi.jpg
-
Amutha_R...
-
Pramila.JPG
-
Jayalaks...
-
Amutha.JPG
Impact
People Impacted: 40
People Getting Sanitation: 40
8 families and approximately 40 members were utilising the ECOSAN toilets constructed in their house.
People Getting Other Benefits: 3
The masons were trained to construct ECOSAN toilets.
show allPhotos
show allDocuments
-
Exposure...
-
Exposure...
-
Amaravat...
-
Amuda_fa...
-
Amudaran...
-
Anandi.JPG
-
Anandi.jpg
-
Jayalaks...
-
Lakshmi_...
-
Malliga_...
-
Mariamma...
-
Premila_...
-
Selvaran...
-
Sumathy_...
-
Uyyavant...
-
Valliamm...
-
Audited_...
-
Mariyamm...
-
Valliyam...
-
Palaniam...
-
Anandi.JPG
-
Anandi.jpg
-
Amutha_R...
-
Pramila.JPG
-
Jayalaks...
-
Amutha.JPG