Self-supporting community- based mitigation program that provides arsenic safe water using modified dugwells along with public education on water related health effects.
Narrative
Digging and boring at this site is complete. The land is donated by Radhapawdo Sardar Polta village of Swarupnagar block. Masonry job is going on.
______________________________
Site selection is ongoing that includes community (village) meeting, recording of the geocode of the site proposed by the community.
-
Meera Hira-Smith of Project Well
- confidential
Implementation Status: complete_unsuccessful Tue 03 Dec 2013, Over 11 Years agoField visit again to set projector programmer
This is the third visit to arrange projector programmer people are uncooperative, do not want to see the ppt presentation. Want the bi-tech well to be closed, scheduled for closure survey on 5 dec.
-
Meera Hira-Smith of Project Well
- confidential
Implementation Status: complete_unsuccessful Tue 24 Sep 2013, Over 11 Years agoField Visit Report of Farida, Laltu, Biswajit and Shilpi
From the beginning due to technical fault this well was not used. Projector program was done once before but the community is not concerned. The hand pump and the delivery pipe are stolen. Closure survey will be done but one more door-to-door campaign followed by another projector program will be done in October and November 2013 in this area where three more bi-tech wells have similar issues. It is assumed that two out of four, including this, may need to be closed down totally.
- Impact Assessment (M&E) Phase Project completed on 31 Oct, 2012 Implementation Phase
-
Biswajit Karmakar of Project Well
- confidential
Implementation Status: completed Wed 04 Jul 2012, Almost 13 Years ago -
Laltu Mirza of Project Well
- confidential
- SMS
Implementation Status: in_progress Sun 01 Apr 2012, About 13 Years agovillage meeting successful
- Implementation Phase Project started on 1 Nov, 2011 Preparation Phase
How it Works
Every field note helps building a history of activity at the project site. Every visit should result in a field note, including visits by peers and 3rd parties. Visits can be before implementation, during implementation and during operational state.
If the field note is during the operating phase of the project, then PWX considers the note as a verification note. Verification can show if the current operating state is different from that in the 'final' report and thus draw attention and resources to resolve issues.
Soon PWX AnalytiX will track the number of projects verified and combine that with the amount of time elapsed since 'completion', to summarize monitoring efforts and the sustainability of projects.
Self-supporting community- based mitigation program that provides arsenic safe water using modified dugwells along with public education on water related health effects.
Narrative
Digging and boring at this site is complete. The land is donated by Radhapawdo Sardar Polta village of Swarupnagar block. Masonry job is going on.
______________________________
Site selection is ongoing that includes community (village) meeting, recording of the geocode of the site proposed by the community.
Other Issues
Unusual and unexpected issues faced during project execution
The large diameter (10”) pipes for 25 bore dugwells have arrived within 3 weeks after placing the order. The construction team is engaged in conducting site selection procedures while the awareness team is continuing with awareness programs in schools and communities in the areas where dugwells are in operation.
Impact
People Getting Safe Drinking Water: 40
According to the register record of October 2012 the number of Families=10; total consumers=37; Male=19, Female=18, children <5 = 3 and students =14
Maintenance/Operating Costs Annual, in US$: $40
Creating and measuring long-term impact
Implementer: Project Well & Aqua Welfare Society
Aqua Welfare Society (AWS) is the partner NGO of Project Well.
Funding
- funded:
- $1,073