Helping 189 households from Truong Binh,Can Gio in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong).

Narrative

Historical Data Imported.

Helping 189 households from Truong Binh,Can Gio in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong). The following methods were utilized for treatment: . The following chemicals are added:

  • Impact Assessment (M&E) Phase Project completed on 31 Dec, 2011 Implementation Phase
  • Implementation Phase Project started on 1 Jan, 2011 Preparation Phase

Helping 189 households from Truong Binh,Can Gio in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong).

Narrative

Historical Data Imported.

Helping 189 households from Truong Binh,Can Gio in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong). The following methods were utilized for treatment: . The following chemicals are added:

Impact

People Impacted: 945

People Getting Safe Drinking Water: 945

189.0

Member Specific Project Data

Water Source: G
Project Type: U
Treatment Type:
Chemicals Added:
Length of Pipe System (m): N/A
Comments on Status: Good
Comments on Solutions: Pipeline extension
Notes: Good
Cost in Local Currency: 334547525

Funding

funded:
$15,560
Community:
$8,970
Final Cost:
$47,207
$15,560:
AusAID

Plan/Proposal