Helping 417 households from Long Hoa,Can Duoc in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong).

Narrative

Historical Data Imported.

Helping 417 households from Long Hoa,Can Duoc in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong). The following methods were utilized for treatment: . The following chemicals are added:

  • Impact Assessment (M&E) Phase Project completed on 31 Dec, 2011 Implementation Phase
  • Implementation Phase Project started on 1 Jan, 2011 Preparation Phase

Helping 417 households from Long Hoa,Can Duoc in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong).

Narrative

Historical Data Imported.

Helping 417 households from Long Hoa,Can Duoc in Vietnam access drinking water. The system is managed by a local Private Investor (Mekong). The following methods were utilized for treatment: . The following chemicals are added:

Impact

People Impacted: 2085

People Getting Safe Drinking Water: 2085

417.0

Member Specific Project Data

Water Source: G
Project Type: U
Treatment Type:
Chemicals Added:
Length of Pipe System (m): N/A
Comments on Status: Good
Comments on Solutions:
Notes: Good
Cost in Local Currency: 2326122350.67034

Funding

funded:
$108,191
Community:
$16,731
Final Cost:
$160,030
$108,191:
AusAID

Plan/Proposal