Helping 273 households from Tam Anh Nam,Nui Thanh in Vietnam access drinking water. The system is managed by the local Communal People's Committee.

Narrative

Historical Data Imported.

Helping 273 households from Tam Anh Nam,Nui Thanh in Vietnam access drinking water. The system is managed by the local Communal People's Committee. The following methods were utilized for treatment: sedimentation tank, vertical gravity. The following chemicals are added: Chlorine

  • Impact Assessment (M&E) Phase Project completed on 31 Dec, 2007 Implementation Phase
  • Implementation Phase Project started on 1 Jan, 2008 Preparation Phase

Helping 273 households from Tam Anh Nam,Nui Thanh in Vietnam access drinking water. The system is managed by the local Communal People's Committee.

Narrative

Historical Data Imported.

Helping 273 households from Tam Anh Nam,Nui Thanh in Vietnam access drinking water. The system is managed by the local Communal People's Committee. The following methods were utilized for treatment: sedimentation tank, vertical gravity. The following chemicals are added: Chlorine

Sustainability

Creating and measuring long-term impact

Distribution network, Treatment, Electro-mechanical (pumps, etc.), Surface water quality,

Other Issues

Unusual and unexpected issues faced during project execution

Main Problems: , , ,Surface water availability,Electro-mechanical (pumps, etc.),Main Reason for Problem: , , , ,Water quantity/quality declined over time

Impact

People Impacted: 1020

People Getting Safe Drinking Water: 1020

273.0

Member Specific Project Data

Water Source: G
Project Type: N
Treatment Type: sedimentation tank, vertical gravity
Chemicals Added: Chlorine
Length of Pipe System (m): 11514
Comments on Status: still working - not enough water in summer
Comments on Solutions: No
Notes: Good
Cost in Local Currency: 54211820

Funding

funded:
$2,521
Community:
$11,178
Final Cost:
$61,034
$2,521:
GPOBA

Plan/Proposal