Helping 287 households from Duy Son,Duy Xuyen in Vietnam access drinking water. The system is managed by a local Cooperative.

Narrative

Historical Data Imported.

Helping 287 households from Duy Son,Duy Xuyen in Vietnam access drinking water. The system is managed by a local Cooperative. The following methods were utilized for treatment: pressure. The following chemicals are added: chlorine

  • Impact Assessment (M&E) Phase Project completed on 31 Dec, 2007 Implementation Phase
  • Implementation Phase Project started on 1 Jan, 2008 Preparation Phase

Helping 287 households from Duy Son,Duy Xuyen in Vietnam access drinking water. The system is managed by a local Cooperative.

Narrative

Historical Data Imported.

Helping 287 households from Duy Son,Duy Xuyen in Vietnam access drinking water. The system is managed by a local Cooperative. The following methods were utilized for treatment: pressure. The following chemicals are added: chlorine

Other Issues

Unusual and unexpected issues faced during project execution

Main Problems: , , , ,Groundwater availability,Main Reason for Problem: , , , ,EMW planning, design & implementation

Impact

People Impacted: 1040

People Getting Safe Drinking Water: 1040

287.0

Member Specific Project Data

Water Source: G
Project Type: N
Treatment Type: pressure
Chemicals Added: chlorine
Length of Pipe System (m): 10806
Comments on Status: OK
Comments on Solutions:
Notes: still working - not enough water in summer
Cost in Local Currency: 703437000

Funding

funded:
$32,718
Final Cost:
$32,718
$32,718:
GPOBA

Plan/Proposal