Helping 260 households from Tam Lanh,Phu Ninh in Vietnam access drinking water. The system is managed by the local Communal People's Committee.

Narrative

Historical Data Imported.

Helping 260 households from Tam Lanh,Phu Ninh in Vietnam access drinking water. The system is managed by the local Communal People's Committee. The following methods were utilized for treatment: pressure. The following chemicals are added: chlorine

  • Impact Assessment (M&E) Phase Project completed on 31 Dec, 2007 Implementation Phase
  • Implementation Phase Project started on 1 Jan, 2008 Preparation Phase

Helping 260 households from Tam Lanh,Phu Ninh in Vietnam access drinking water. The system is managed by the local Communal People's Committee.

Narrative

Historical Data Imported.

Helping 260 households from Tam Lanh,Phu Ninh in Vietnam access drinking water. The system is managed by the local Communal People's Committee. The following methods were utilized for treatment: pressure. The following chemicals are added: chlorine

Impact

People Impacted: 1040

People Getting Safe Drinking Water: 1040

260.0

Member Specific Project Data

Water Source: G
Project Type: N
Treatment Type: pressure
Chemicals Added: chlorine
Length of Pipe System (m): 3323
Comments on Status:
Comments on Solutions:
Notes: OK
Cost in Local Currency: 953458350

Funding

funded:
$44,346
Final Cost:
$44,346
$44,346:
Anonymous