Helping 365 households from Dien Tien,Dien Ban in Vietnam access drinking water. The system is managed by a local Private Mgmnt (Center).

Narrative

Historical Data Imported.

Helping 365 households from Dien Tien,Dien Ban in Vietnam access drinking water. The system is managed by a local Private Mgmnt (Center). The following methods were utilized for treatment: pressure. The following chemicals are added: chlorine & alum

  • Impact Assessment (M&E) Phase Project completed on 31 Dec, 2007 Implementation Phase
  • Implementation Phase Project started on 1 Jan, 2007 Preparation Phase

Helping 365 households from Dien Tien,Dien Ban in Vietnam access drinking water. The system is managed by a local Private Mgmnt (Center).

Narrative

Historical Data Imported.

Helping 365 households from Dien Tien,Dien Ban in Vietnam access drinking water. The system is managed by a local Private Mgmnt (Center). The following methods were utilized for treatment: pressure. The following chemicals are added: chlorine & alum

Other Issues

Unusual and unexpected issues faced during project execution

Main Problems: , , , ,Groundwater availability, Main Reason for Problem: ,EMW planning, design & implementation,Poor (technical) maintenance,Funding/financial problems,Water quantity/quality declined over time

Impact

People Impacted: 1825

People Getting Safe Drinking Water: 1825

365.0

Member Specific Project Data

Water Source: S
Project Type: N
Treatment Type: pressure
Chemicals Added: chlorine & alum
Length of Pipe System (m): 15246
Comments on Status: OK
Comments on Solutions:
Notes: OK
Cost in Local Currency: 601387250

Funding

funded:
$27,971
Final Cost:
$27,971
$27,971:
Jack Anderson

Plan/Proposal