Helping 261 households from Tam Nghia,Nui Thanh in Vietnam access drinking water. The system is managed by a local Private Mgmnt (Center).

Narrative

Historical Data Imported.

Helping 261 households from Tam Nghia,Nui Thanh in Vietnam access drinking water. The system is managed by a local Private Mgmnt (Center). The following methods were utilized for treatment: pressure. The following chemicals are added: chlorine

  • Impact Assessment (M&E) Phase Project completed on 31 Dec, 2007 Implementation Phase
  • Implementation Phase Project started on 1 Jan, 2007 Preparation Phase

Helping 261 households from Tam Nghia,Nui Thanh in Vietnam access drinking water. The system is managed by a local Private Mgmnt (Center).

Narrative

Historical Data Imported.

Helping 261 households from Tam Nghia,Nui Thanh in Vietnam access drinking water. The system is managed by a local Private Mgmnt (Center). The following methods were utilized for treatment: pressure. The following chemicals are added: chlorine

Sustainability

Creating and measuring long-term impact

Storage tank/construction, Treatment, Electro-mechanical (pumps, etc.), Surface water quality, Surface water availability

Other Issues

Unusual and unexpected issues faced during project execution

Main Problems: Groundwater availability,Groundwater quality,Electro-mechanical (pumps, etc.),Treatment,Storage tank/constructon Main Reason for Problem: , , ,Poor (technical) maintenance,Water quantity/quality declined over time

Impact

People Impacted: 1170

People Getting Safe Drinking Water: 1170

261.0

Member Specific Project Data

Water Source: G
Project Type: U
Treatment Type: pressure
Chemicals Added: chlorine
Length of Pipe System (m): N/A
Comments on Status: Good
Comments on Solutions: EMW works with local CPC and the project hamlets to get good water managers to operate the system again in 2013.
Notes:
Cost in Local Currency: 601387250

Funding

funded:
$27,971
Final Cost:
$27,971
$27,971:
Anonymous

Plan/Proposal