Helping 351 households from Duy Phuoc,Duy Xuyen in Vietnam access drinking water. The system is managed by a local Cooperative.
Narrative
Historical Data Imported.
Helping 351 households from Duy Phuoc,Duy Xuyen in Vietnam access drinking water. The system is managed by a local Cooperative. The following methods were utilized for treatment: Pressure.
- Impact Assessment (M&E) Phase Project completed on 31 Dec, 2006 Implementation Phase
- Implementation Phase Project started on 1 Jan, 2006 Preparation Phase
Helping 351 households from Duy Phuoc,Duy Xuyen in Vietnam access drinking water. The system is managed by a local Cooperative.
Narrative
Historical Data Imported.
Helping 351 households from Duy Phuoc,Duy Xuyen in Vietnam access drinking water. The system is managed by a local Cooperative. The following methods were utilized for treatment: Pressure.
Sustainability
Creating and measuring long-term impact
Distribution network, Treatment, Electro-mechanical (pumps, etc.), Surface water quality,
Other Issues
Unusual and unexpected issues faced during project execution
Main Problems: , ,Groundwater quality,Electro-mechanical (pumps, etc.),TreatmentMain Reason for Problem: , ,EMW planning, design & implementation,Water quantity/quality declined over time,Other